Covered some bad spots with putty , sanding next , then a layer of paint , This is temporary until i start the body off sometime sooner i hope .
The engine bay was done in Matte black and its ready to recieve the engine .
Firewall seal channels cleaned . These seals are very important for your vw . Keeps the heat out of the engine bay , less chance of overheating . Very important to get both of these seals .
Cleaned the channels where the new seals will be going into . The old seals were stuck and had turned literally into rock so removing them was hard .
Closing time finally . 3 long months . Phew!!! .
[emoji7] Hollow [emoji7]
from where did you get these done?
A rim guy near liaquat bagh .
Coated in high heat aluminium .
Piston's installed .
New kolbenschmidt 1300cc Piston/Cylinder's .
Cylinder's installed .
New oil cooler , New fuel pump , Refurbished Distributor installed on the block .
Tires on the fresh pair of deep/hollow rims .