Assalam u alaikum
Long time no update. So here it is.
2jz-ge engine installed. Did almost 170 on Kashmir highway. . After the run, realised that the engine is too fast. So
Back brakes - Prado
Front brakes - Surf.
Suspension work is almost finished. 3 inches down from original position. Fender cutting is also done and fender flairs in place. 16" Hollow rims in silver/black.
This sums up Engine and suspension work. Paint job, interior and denting will be done after 1 month of driving and getting small tweaks finalised.
The mechanic asked me to put roll cage in it, but that means that my 4 kids will not be able to sit in it. What is your suggestion on it.
Stay blessed and Jazakallah.
Wassalam
Ali Amen